Ivanhoe Electric Inc. filed an 8-K on November 19, 2026, disclosing initial drill results from its Gleeson Copper-Gold Project in southeastern Arizona, including assay results from the first nine of eleven completed holes.
Key Highlights
- Eleven holes completed: Results from the first eleven completed drill holes discovered two separate, significant mineralized domains below low-angle faulting, according to the filing.
- Key breccia interval in CGD26-TR-003: The company reported 123.60 meters at 0.91% copper, 0.44 g/t of gold, and 5.27 g/t of silver from 601.70 meters depth, including 71.03 meters at 1.38% copper, 0.52 g/t of gold, and 6.73 g/t of silver from 640.32 meters.
- Extended interval in CGD26-TR-008: The filing disclosed 381.66 meters at 0.34% copper, 0.29 g/t of gold, and 1.07 g/t of silver from 587.85 meters, located approximately 250 meters southwest of CGD26-TR-003.
- Breccia zone dimensions: Copper-gold-silver breccia has been logged spanning approximately 500 by 500 meters, from 600 meters depth to over 380 meters downhole thickness in the south-west, and remains open in multiple directions.
- Deeper domain identified: Intrusive and carbonate replacement hosted copper-gold-silver-zinc mineralization has been discovered below 1,000 meters depth, with mineralization logged over 800 meters of north-to-south extent and 600 meters east to west.
- Project scale: The Gleeson Copper-Gold Project controls over 19,606 acres of mineral rights and 2,033 acres of private surface rights, with all current drilling occurring on private land.
- 2026 drilling target: The company's plan for the remainder of 2026 includes expanding the program to complete a total of 16,000 meters of drilling by year-end, with drilling having begun in November 2025.
Gleeson Project: Two Mineralized Domains and Assay Status
According to the 8-K filed by Ivanhoe Electric Inc. (NYSE American:IE) on November 19, 2026, the company announced initial drill results from its Gleeson Copper-Gold Project, which the filing describes as the company's "highest priority exploration project." The project is located within the historic Courtland-Gleeson Mining District, approximately 28 miles north of Bisbee, Arizona. Ivanhoe Electric began acquiring mineral and surface rights at the project in 2024.
The filing states that two mineralized domains have been intersected below a low-angle fault beginning at approximately 600 meters depth. The upper domain consists of a breccia that "incorporates fragments of earlier skarn and carbonate-replacement mineralization, intrusions and sediments which are then overprinted by multiple strong copper, gold and silver mineralizing events," according to the company's disclosure. A deeper domain of intrusive-hosted, skarn, and carbonate-replacement mineralization begins at approximately 1,000 meters depth. The filing notes that the possibility exists for "several mineralized centers at Gleeson."
The filing reports that complete assay results have been received for the first seven holes, with partial results received for two holes and assays pending for the remaining four. Holes CGD26-TR-008 and CGD26-TR-009 have intersected carbonate replacement mineralization from depths of approximately 1,250 meters, with assay results expected before the end of 2026. The company noted that "visual observations are not a substitute for laboratory analysis, and the presence of sulfide minerals does not indicate grade." The filing also references the nearby Bisbee Mining District, which the company states produced over 207 million tonnes of ore over a 133-year operating life.
What Was Disclosed
Ivanhoe Electric filed an 8-K under Items 7.01 and 8.01 disclosing initial drill results from the Gleeson Copper-Gold Project in southeastern Arizona, including specific assay intervals from early drill holes and details on two mineralized domains discovered below 600 meters depth.




Please wait processing your request...