Jaguar Uranium Corp. disclosed an independent Mineral Resource Estimate for its 100%-owned Berlin Uranium-Polymetallic Project in Colombia on November 25, 2026, covering the initial 2.9 km of a 10.5 km mineralized trend.

Key Highlights

  • Indicated Resource: 937 kt grading 561 ppm U3O8, containing 1.2 Mlb U3O8, according to the filing.
  • Inferred Resource: 11,343 kt grading 562 ppm U3O8, containing 14.1 Mlb U3O8, as reported by independent firm SLR International Corporation.
  • NSR Cut-off: Mineral Resources are reported above a Net Smelter Return cut-off value of US$245/t, incorporating metallurgical recovery assumptions and off-site charges.
  • Co-products included: The resource inventory captures vanadium, phosphate, rare earth oxides (neodymium, dysprosium, terbium, yttrium), nickel, zinc, and molybdenum alongside uranium.
  • Trend coverage: The current MRE encompasses only 2.9 km of the total 10.5 km mineralized trend, which the company disclosed remains open to the north.
  • Balance sheet: The company disclosed it maintains nearly US$18 million in cash and no debt.
  • Effective date: The MRE carries an effective date of November 5, 2026, prepared under SEC Regulation S-K 1300 and NI 43-101.

Berlin Project MRE Details: Resource Classification, Co-products, and Methodology

Jaguar Uranium Corp. (NYSE American:JAGU) announced the first Mineral Resource Estimate for its Berlin Uranium-Polymetallic Project, located in the Caldas Department of Colombia. The estimate was prepared by SLR International Corporation, an independent geological and mining engineering consulting firm, with an effective date of November 5, 2026. According to the filing, the MRE was prepared in accordance with both Subpart 1300 of Regulation S-K and National Instrument 43-101.

The filing reports Indicated Mineral Resources of 937 kt at 561 ppm U3O8, containing 1.2 Mlb U3O8, and Inferred Mineral Resources of 11,343 kt at 562 ppm U3O8, containing 14.1 Mlb U3O8. Both categories apply a bulk density of 2.72 t/m3, a long-term uranium price of US$105/lb U3O8, and a metallurgical recovery for uranium of 96.1%. The filing notes that Inferred Mineral Resources "have a lower level of confidence than Indicated Mineral Resources and cannot be converted directly into Mineral Reserves." No Mineral Reserves have been estimated, and "Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability," according to the disclosure.

The NSR cut-off of US$245/t is based on assumed mining, processing, and general and administrative costs of US$47.85/t, US$191.40/t, and US$5.22/t, respectively, as stated in the filing. Reference metal prices used in the NSR formulation include US$11.97/kg V2O5, US$139.00/kg Nd2O3, US$3,750/kg Dy2O3, US$5,200/kg Tb2O3, US$1,100/kg Y2O3, US$13.00/kg Ni, US$1.85/kg Zn, US$26.50/kg Mo, and US$1,000/t P2O5. The filing also notes that the upper portion of the deposit, from surface to approximately 25 m depth and designated as the lateritized mineralized layer, was excluded from the current underground MRE because its potential extraction would require open-pit mining methods and distinct parameters.

What Was Disclosed

Jaguar Uranium Corp. disclosed its first independent MRE for the Berlin Project in Colombia, covering 2.9 km of a 10.5 km trend, with 1.2 Mlb Indicated and 14.1 Mlb Inferred U3O8, plus multiple critical mineral co-products, prepared by SLR International Corporation under SEC and NI 43-101 standards.