Indonesia Energy Corporation Limited filed a Form 6-K on October 6, 2026, reporting that President Frank Ingriselli led a delegation to the company's Kruh Block in Sumatra, Indonesia, to mark oil production from the K-29 well and inspect progress at the planned WK-5 well site.
Key Highlights
- K-29 production celebrated: President Frank Ingriselli led a delegation in early October 2026 to celebrate oil production from the recently drilled K-29 well at the Kruh Block.
- WK-5 site preparation underway: Site setup and rig assembly at the WK-5 well location are actively underway, using the same rig that drilled the K-29 well, according to the filing.
- Spud timing anticipated: The company disclosed preparations are ongoing for the anticipated spudding of the WK-5 well by the end of October 2026.
- Planned depth of WK-5: WK-5 is planned to be drilled to approximately 5,200 feet, compared to approximately 3,400 feet for the K-29 well.
- Additional formations targeted: WK-5 is designed to test additional formations identified through the company's 3-D seismic program, including a potential natural gas-bearing formation.
- Kruh Block acreage: Both K-29 and WK-5 are located within the company's 63,000-acre Kruh Block on the island of Sumatra.
Indonesia Energy Reports Drilling Progress at Kruh Block, Sumatra
Indonesia Energy Corporation Limited (NYSE American:INDO) filed a Form 6-K with the U.S. Securities and Exchange Commission on October 6, 2026, attaching a press release describing operational activity at its Kruh Block concession in Sumatra, Indonesia. According to the filing, President Frank Ingriselli led a company delegation to the site in early October 2026 to mark the commencement of oil production from the K-29 well, which the company reported was recently drilled.
The filing states the delegation also visited the WK-5 well location, where site setup and rig assembly are actively underway using the same rig deployed for the K-29 well. The company disclosed that WK-5 is planned to be drilled to a depth of approximately 5,200 feet, which the filing described as "significantly deeper than the K-29 well," drilled to approximately 3,400 feet. Preparations for the anticipated spudding of WK-5 are described as ongoing, with spudding targeted by the end of October 2026.
According to the filing, WK-5 is designed to test additional formations identified through the company's extensive 3-D seismic program, including a potential natural gas-bearing formation. The filing notes that both K-29 and WK-5 are located within the company's 63,000-acre Kruh Block. The Form 6-K states it shall be incorporated by reference into the company's shelf registration statement on Form F-3 (Registration Number 333-278175), declared effective by the SEC on May 31, 2024. The filing contains forward-looking statements, which the company cautioned are subject to risks, uncertainties, and assumptions that could cause actual results to differ materially.
What Was Disclosed
Indonesia Energy Corporation Limited disclosed via Form 6-K, dated October 6, 2026, that its President visited the K-29 and WK-5 well sites at its 63,000-acre Kruh Block in Sumatra. K-29 is producing oil, and WK-5 spudding is anticipated by month-end.




Please wait processing your request...