Indonesia Energy found good quality oil at K-29, a well drilled to 3,378 feet, and expects actual production operations to start in the next couple of weeks. The result matters to investors because IEC expects more operating data as production begins and is continuing its 2026 drilling program at WK-5.

Key Highlights

  • Oil naturally seeped from the perforation gun at targets approved by Pertamina during K-29 testing.
  • Drilling at K-29 recorded zero lost-time injuries and zero environmental, health and safety incidents.
  • Indonesia Energy’s K-29 well was spudded on July 25, 2026, before reaching its reported total depth.

K-29 Oil Test Moves Toward Production

Actual production operations are expected to begin in the next couple of weeks. K-29 was spudded on July 25, 2026, before reaching its reported total depth. IEC (AMEX: INDO) said the result is generally viewed positively and differs from previous wells at the Kruh Block.

Drilling Rig Heads to WK-5

The rig used for K-29 is being mobilized toward the WK-5 wellsite as IEC continues its planned drilling operations for 2026. Drilling at K-29 was completed with zero lost-time injuries and zero environmental, health and safety incidents.